.

The Best Process for A Swimming Pool Building

  1. Design: The company which you have hired must send you a designer, so that they can look at the area and come up with an initial plan. If they don’t come to your home then you must attend their office with the pictures of the garden and the measurements of the area that you want as the pool. It is important for you to work with the designer and if you have any idea, you can also share it with them, so that they are able to incorporate the design in their plans.
  2. Construction: A representative comes into your house and lays out the entire pool area. It may take a day or two to remove the ground from the pool area.
  3. Reinforcement: Once the land is cleared, the company reinforces the pool area with steel rods.
  4. Plumbing: Plumbing is required in the pool so that it remains clean and purified. Therefore a plumber comes and fits the plumbing lines.
  5. Concrete and Decking: After the plumbing work is done, the pool walls are fitted with a material that is similar to concrete and then the decking is plastered. The decking is the frame of the pool, so when it is done completely, you will see how the pool will look like.
  6. Equipment: The technicians then install all the pool equipment in the area you have chosen. The equipment is massive, so you can ask the pool builders if you can cover it up.
  7. Finishing and Landscaping: Once the pool area is covered with a waterproof finishing and the floor is colored, then the company starts with the landscaping and finishing touches around the pool.

Address

1001 Karlee Blvd,
Loganville, GA 30052

1431 Capital Ave,
Watkinsville, GA 30677

Telephone

Office/Shop:
(770) 466-2376

Pool Sales:
844-7-POOLMAN

Get your free quote

Contact Us